Completed Projects

Choose Category

IHI Infrastructure Systems Co, Ltd.

Welding works of towers of Izmit Bay Crossing Bridge

IHI Infrastructure Systems Co, Ltd.

Fabrication of Anchor Frame for Izmit Bay Crossing Bridge

IHI Corporation

Fabrication for seismic reinforcement plates and beams of bridges

IHI Corporation

Expansion joint fabrication and erection for Second Bosphorus Bridge

IHI Corporation

Replacement of 7 each hanger plates at First Bosphorus Bridge

IHI Infrastructure Systems Co, Ltd.

Design and Manufacturing of 8 each aluminum maintenance gantries

Korea Erection

Third Bosphorus Bridge Erection and Welding Works

IHI Corporation

Fabrication and erection of tensioning system for Goldenhorn Bridge

Freysaş (Freyssinet)

Fabrication of 4 maintenance gantries

Tokyo Rope Mfg. Co., Ltd.

Fabrication of lifting beam

Hyundai Engineering and SK Engineering Joint Venture

Third Bosphorus Bridge bearing installation works

Daelim-Limak-SK Eng.-Yapı Merkezi JV

Temporary Water Supply Work for Canakkale Bridge Construction Areas

IHI Corporation

Fabrication and erection of maintenance gantries of Goldenhorn Bridge

IHI Infrastructure Systems Co, Ltd.

Izmit Bay Crossing Bridge Doors and Hatches Manufacturing

IHI Corporation

Lock-up device erection at Mecidiyeköy viaduct

IHI Corporation

Fabrication and erection of drainage systems

Gülermak - Doğuş Joint Venture

Column Reinforcement works at the Esenler Viaduct

JSBB (Japanese Joint Venture For Second Bosphorus Bridge)

Various revisions at the Second Bosphorus Bridge

Hyundai Engineering and SK Engineering Joint Venture

Fabrication and installation of 4 each security gates

Flint Neill Partnership

Various Fabrications and Services