Maire Tecnimont

Manufacturing of Degassifier

Maire Tecnimont

Client : Maire Tecnimont

Location : Gemlik / Turkey

Starting Date : 05.07.2021

Completion Date : 27.10.2021

Job Description : Manufacturing of Degassifier

Sector Type : Chemical Plant Industry

Product Type : Pressure Vessel

Project Details :

Process & Thermal design

Procurement

Manufacturing of 1 ea Degassifier including CS Storage and SS Heater Tanks

StorageTank;

  • Heads; ASME 2:1 Elliptical Heads Thickness 16 mm. (14 mm after forming)
  • Shell; 6833 mm lenght, OD. Ø 3000, thickness 16 mm
  • Total Vessel Lenght; 8363 mm
  • Total Vessel Weight; 16400 kg

Heater Tank;

  • Heads; ASME 2:1 Elliptical Heads Thickness 10 mm. (8 mm after forming)
  • Shell; 1525 mm lenght, OD. Ø 1830, thickness 10 mm
  • Total Vessel Lenght; 4500 mm
  • Total Vessel Weight;  3500 kg

PWHT

Hydrotest at 5,01 bar(g)